# Rail firm disputes Sheffield star Dan Walker’s claim ‘not a single train has arrived on time’

- URL: https://talkfuse.com/story/rail-firm-disputes-sheffield-star-dan-walkers-claim-not-a-single-train-has-arrived-on-time/
- Published: 2026-08-09T04:41:47+00:00
- Original publisher: The Star (Sheffield)
- Original article: https://www.thestar.co.uk/news/traffic-and-travel/rail-firm-disputes-sheffield-star-dan-walkers-claim-not-a-single-train-has-arrived-on-time-8845841
- Topics: Celebrity, Entertainment, Sheffield

## Key points

- Dan Walker claimed zero on-time arrivals over 3 months on Sheffield-London route; EMR disputed the claim
- EMR blamed Hitachi Rail fleet reliability issues and maintenance problems for service disruptions
- Ongoing safety strikes and a fatal June collision have compounded the rail operator's reputation challenges

## Summary

Channel 5 newsreader Dan Walker publicly disputed East Midlands Railway's service quality on social media, claiming he had experienced zero on-time arrivals over a three-month period on his regular Sheffield-to-London commute, with only one in five trains departing punctually. The rail operator contested Walker's characterisation of their performance, stating his account was inaccurate and pointing to ongoing efforts to improve reliability on the route.

EMR's service has faced mounting challenges, including operational issues with newly introduced Hitachi Rail Class 810 trains and maintenance problems affecting existing Class 222 stock, leading the company to reduce Sheffield-London services in July. The situation has been further complicated by industrial action from the RMT union over safety concerns with the new fleet, a fatal collision between two EMR trains in June, and passenger frustration despite government-regulated ticket pricing that has been frozen until March 2027.

---
Summarised by TalkFuse (https://talkfuse.com/). Quote the original publisher for the reporting and link this page for the summary and discussion.
