# Smart meters to cost the UK billions: 2G switch-off means replacing 12-13 million

- URL: https://talkfuse.com/story/smart-meters-to-cost-the-uk-billions-2g-switch-off-means-replacing-12-13-million/
- Published: 2026-11-10T12:38:51+00:00
- Updated: 2026-11-10T13:05:41+00:00
- Original publisher: The Register
- Original article: https://www.theregister.com/networks/2026/11/10/smart-meters-to-cost-the-uk-billions-2g-switch-off-means-replacing-12-13-million/5308728
- Topics: UK, World

## Key points

- Up to 13 million smart meters may need upgrades.
- The estimated replacement bill is about £4 billion.
- Older SMETS1 meters generally need full replacement.

## Summary

The planned closure of 2G and 3G networks could leave 12 to 13 million UK smart meters unable to communicate properly by 2033, requiring a large-scale replacement programme. A report by connectivity company Wirepas estimates the work could cost about £4 billion, with the expense ultimately adding to household energy bills.

The affected meters include newer SMETS2 models, where the communications module can be replaced, and around 7 million older SMETS1 installations, which usually need a whole new meter. The report puts SMETS2 module replacement at £1.3 billion to £1.4 billion and SMETS1 replacements at £2.1 billion to £2.45 billion. UK mobile operators plan to begin switching off 2G from 2029 to 2030; 3G services have already been withdrawn.

---
Summarised by TalkFuse (https://talkfuse.com/). Quote the original publisher for the reporting and link this page for the summary and discussion.
