News, events and chat from Sheffield and South Yorkshire.
Trams will need to cope with 50°C heat, says mayor
South Yorkshire mayor Oliver Coppard has revealed that the Sheffield Supertram network is being upgraded to withstand temperatures of up to 50°C, as part of wider efforts to prepare the region for the effects of climate change. Speaking during a phone-in on BBC Radio Sheffield, the Labour mayor said the current network can only cope with temperatures up to 34°C, forcing services to be suspended when heat exceeds that threshold, and warned that further adaptation such as home air conditioning and solar panels would be needed as extreme weather worsens.
Coppard said around £500m is being spent on renewing the tram network with the higher heat tolerance built in for the future, and revealed he now receives daily temperature forecasts to check whether the tram network needs to be halted. He also touched on other issues during the phone-in, including calling for greater investment to close the north-south divide in GCSE attainment, criticising Hitachi Rail for delivering new East Midlands Railway trains three years late with multiple faults, and expressing scepticism about the government's use of an emergency siren to warn about wildfire risks during a barbecue-related incident near Doncaster station.
In short
- Sheffield's Supertram is being rebuilt to handle 50°C heat.
- £500m renewal project responds to escalating climate change concerns.
- Mayor also criticised EMR train delays and school funding gaps.
Steelman: both sides, in good faith
The strongest fair case each way — we don't pick a winner.
The case for
Major infrastructure systems must be designed for the climate conditions they will face throughout their operational life, and since tram networks require periodic renewal anyway, incorporating heat tolerance is wise planning rather than extra expense. The current network fails at 34°C, causing regular disruptions; if climate projections suggest temperatures could reach 50°C within the system's lifespan, upgrading prevents costly recurring service suspensions and eventual catastrophic failure. Investing in this resilience now, integrated with necessary renewal spending, is more economical than managing infrastructure crises later.
The case against
Whilst some climate adaptation is prudent, 50°C scenarios are uncertain and extreme, and public spending should prioritise probable risks and pressing current needs rather than speculative worst-cases. Given finite budgets and multiple competing infrastructure and climate priorities—including existing failures and risks like flooding that affect more people—the case for spending £500m on heat resilience specifically warrants careful scrutiny. Operational measures or more modest upgrades might achieve substantial benefits at lower cost, and local authorities should weigh this carefully against other pressing demands on public resources.
Explained simply
Sheffield Supertram is the tram network serving Sheffield and nearby areas in South Yorkshire. Like other transport systems, it can be affected by very hot weather: heat can damage or disrupt equipment, and services may have to stop if conditions exceed what the network can safely handle.
South Yorkshire’s mayor, Oliver Coppard, leads the regional authority responsible for transport and other local services. Climate change is expected to bring more frequent or intense heat in many places, so councils and transport operators are considering how to adapt infrastructure, homes and energy systems. This matters because disruption to public transport can affect people’s ability to travel to work, school and essential services.