No timeline set for fixing hole under tram route

feeds.bbci.co.uk ·

Sheffield’s blue Supertram route between Gleadless Townend and Halfway remains suspended, with no timetable for reopening after a Victorian well and mineshaft were found beneath the tracks. The disruption is affecting passengers and businesses, particularly around Crystal Peaks shopping centre, highlighting the role of public transport in access to shops and leisure.

Engineers have carried out surveys, technical studies and borehole drilling, and are investigating groundwater and possible historic mine workings. An obstruction inside the shaft needs further examination before permanent repairs can be planned. Replacement buses accept tram tickets, but the committee meeting heard that some 120 buses are full, leaving passengers behind.

In short

  • No reopening date has been set for the suspended tram route.
  • Engineers are investigating an obstruction and conditions beneath the tracks.
  • Crystal Peaks businesses report reduced takings, while replacement buses are crowded.

Explained simply

Sheffield’s Supertram is a light rail network serving the city and nearby communities. The blue route links the city with suburbs to the south-east, including Gleadless, Halfway and the Crystal Peaks shopping centre.

The tram service is run by South Yorkshire’s transport authority, with engineers responsible for assessing and repairing the track infrastructure. Victorian wells and old mine workings can leave hidden voids underground, so surveys and drilling help establish what lies below the tracks and how it may affect their stability.

When a tram section is closed, replacement buses can help passengers continue their journeys, but they may not carry everyone who would normally use the service. Disruption can affect access to work, shops and leisure destinations, including businesses that rely on passing customers.

Art Culture Sheffield

Read the full article at the source →

Log in to join the discussion