World news and discussion on TalkFuse.
The Post’s 225 icons: Sandhogs risk it all to dig out vital NYC tunnels
Sandhogs, members of construction union Local 147, have spent about 150 years building and maintaining the tunnels and pipes that keep New York City moving and supply its water. Their work underpins the subway, rail links, bridges, sewage and steam systems, though most residents rarely see it.
The work has carried serious risks: workers have been crushed, struck by trains, fallen down shafts or buried in cave-ins. Sandhogs helped build the Brooklyn Bridge foundations and major road tunnels, as well as subway connections including East Side Access; some water tunnels lie as deep underground as the Chrysler Building is tall. Dozens of workers have died during construction of Water Tunnel No. 3, which remains under construction.
In short
- Local 147 sandhogs built vital tunnels and pipes beneath New York.
- Their work has supported transport, water and other city services for 150 years.
- Dozens died while digging the still unfinished Water Tunnel No. 3.
Explained simply
New York City depends on tunnels and pipes to move people, carry water and handle sewage and steam. Much of this infrastructure is hidden underground, so the workers who build and maintain it are rarely seen.
Sandhogs are construction workers in Local 147, a union whose members have worked beneath the city for about 150 years. Their projects include subway and rail links, road tunnels and water systems, as well as the foundations of the Brooklyn Bridge.
The work can involve deep shafts, moving trains and unstable ground, and workers have been killed in accidents and cave-ins. Water Tunnel No. 3, a major project still under construction, has claimed dozens of workers’ lives.